The Beijing News Express (reporter Pei Jianfei) "Difficulty in handling illegal traffic in off-site rental cars" is a problem many drivers have encountered. A few days ago, the reporter learned from the Beijing Traffic Management Bureau that Beijing traffic police will take the lead in implementing pilot measures to facilitate the illegal traffic treatment of rental cars nationwide. Drivers can self-handle the traffic violation records of leased vehicles through the “Transportation Management 12123 ” APP .virtual currency schemes - a further analysis In the next step, the mid-line project of the South-to-North Water Transfer Project will also implement the main line storage project. Shi Chunxian pointed out that the south-to- north water transfer project has a total length of more than 1,400 kilometers, and there is no storage reservoir yet. Some risks in the future operation or maintenance of the project may bring the risk of water interruption. Once the water is interrupted, it may affect the urban water supply as the main water source. . In order to improve the guarantee rate and the project can be repaired in time, the Ministry of Water Resources is planning some storage reservoirs along the line. Regulated storage reservoirs are divided into two types. The first type is already built and connected to the main line project. Once there is a problem, the existing reservoir can be used to transport water to the main line in sections. The second type is to plan some new reservoirs by the side of the canal in accordance with local development needs and geological conditions. Water is usually poured in when there is a lot of water, and then it is released when needed to improve the guarantee rate of the main line project.
The Beijing News Express (reporter Pei Jianfei) "Difficulty in handling illegal traffic in off-site rental cars" is a problem many drivers have encountered. A few days ago, the reporter learned from the Beijing Traffic Management Bureau that Beijing traffic police will take the lead in implementing pilot measures to facilitate the illegal traffic treatment of rental cars nationwide. Drivers can self-handle the traffic violation records of leased vehicles through the “Transportation Management 12123 ” APP .virtual currency schemes - a further analysis In the next step, the mid-line project of the South-to-North Water Transfer Project will also implement the main line storage project. Shi Chunxian pointed out that the south-to- north water transfer project has a total length of more than 1,400 kilometers, and there is no storage reservoir yet. Some risks in the future operation or maintenance of the project may bring the risk of water interruption. Once the water is interrupted, it may affect the urban water supply as the main water source. . In order to improve the guarantee rate and the project can be repaired in time, the Ministry of Water Resources is planning some storage reservoirs along the line. Regulated storage reservoirs are divided into two types. The first type is already built and connected to the main line project. Once there is a problem, the existing reservoir can be used to transport water to the main line in sections. The second type is to plan some new reservoirs by the side of the canal in accordance with local development needs and geological conditions. Water is usually poured in when there is a lot of water, and then it is released when needed to improve the guarantee rate of the main line project.